PROJECT DESCRIPTION - Balkan Stream Gas Pipeline

The project ”Expansion of the gas transmission infrastructure of Bulgartransgaz EAD parallel to the north (main) gas pipeline to the Bulgarian-Serbian border”, stage: “Linear part” is implemented in connection with an existing possibility to expand Bulgartransgaz EAD gas transmission network with a view to boosting the security of supply of natural gas to Bulgaria and the neighbouring countries and the regions.

Sicilsaldo Group performed the Construction & Pre-commissioning activities on the “Segment B”, sub-stages A6 and A7 for a total of 103km. The Project has been completed within 12 months.

KEY NUMBERS

  • Performed 1 pigging facility.
  • 3 Block Valve Station realized.
  • One horizontal directional drilling (HDD) of 900m.
  • 20 Trenchless Crossing.

CONSTRUCTION PROJECTS

PROJECT DETAILS

Category:

Transmission and Distribution System – Pipeline

Client:

Bulgartransgaz EAD

EPC Contractor:

Arkad Consortium

Our Role:

Subcontractor

Location:

Bulgaria

Size:

48″

Total Lenght:

103 KM

Completion:

2020